EDF Saint-Alban plant, located in Saint-Maurice-l’Exil, France, collaborated with NPO Europe to address a few opportunities for shielding the steam generators during sludge lancing operations. Saint-Alban wanted to reduce shielding installation and removal time from the benchmark of 5.5 hours, reduce total project dose from 476 mRem (4,760 μSv), and remove the physical clutter of […]
Exelon Braidwood Station recently saw very good dose reduction with their dry cask campaigns by utilizing NPO T-Flex® Annulus Gap Shielding. This was designed to fit in the annulus gap between the canister and transfer cask and had a fire blanket covering specified by Braidwood. The annulus gap shielding, in addition to more NPO dry […]